Devel of Oper Procs for Emergency Conds at Nucl Powerplants

Read or Download Devel of Oper Procs for Emergency Conds at Nucl Powerplants (IAEA TECDOC-341) PDF

Best nonfiction_6 books

The Cloud Maker

Clive Cussler meets Dan Brown during this excessive voltage event mystery within which bold younger climbers bump into a good mystery hidden within the depths of the Himalayas and locate themselves at the run from the chinese language mystery police. From the Hardcover version.

Demons and how to deal with them

Paperback 1986 30p. Vol. 2 eight. 50x5. 50x0. 15 ebook approximately Demons, Jesus and Spirit

Additional info for Devel of Oper Procs for Emergency Conds at Nucl Powerplants (IAEA TECDOC-341)

Sample text

REP. of INDIA SPAIN UNITED KINGDOM G. Stefanov, Nuclear Power Station Kozloduy J. Laaksonen, Institute of Radiation Protection R. Marcille, Electricit6 de France H. V. L. Butragueno, Consejo de Seguridad Nuclear S. Gronow*, HM Nuclear Installations Inspectorate W. Ross, HM Nuclear Installations Inspectorate COMMISSION OF THE EUROPEAN COMMUNITIES G. P. Vuorinen, Scientific Secretary Consultants Meeting on Operating Procedures for Abnormal Conditions, 26-30 November 1984 FINLAND FRANCE GERMANY, FED.

Put borating automatics in operation monitor automatic borating with 2200 ppm 5 Cool-down with 50 °C/h 4 Dump station available --- 6b 1 Key switch RAOO U100 is set in 50 *C/h-position Dump station not available Key switch RAOO U100 is set in 50 'C/h-position Dump control valves are put on automatic control SG-PORV station shut-off valves open Put automatic cool-down control system in operation SG-PORVs are put on automatic control Monitor cool-down rate 50 'C/h I 7. r~ H _______ e___ Control room operators J Roundmen PRESENT 47 REFERENCES The following documents provided by consultants and Technical Committee members were considered in the preparation of this document.

F Secondary heat sink: d. IF neither condition is satisfied, 1. Total AFW flow to nonfaulted steam generators THEN DO NOT TERMINATE GREATER THAN SI. (3) GPM Go to step 27. OR 2. Wide range level in at least one non-faulted steam generator - greater than (4) 26. % Terminate SI: a. Go to ES-O. 3, SI TERMINATION FOLLOWING SPURIOUS SI. 43 EXAMPLE 13 Inclusion of contingency actions in step list format If the plant responds as expected, the operator proceeds down the left hand column and does not look at the steps on the right.

Download PDF sample

Rated 4.68 of 5 – based on 16 votes